No number | Certification / coverage | Certification specification | Suitable for the product | Note |
1 | Battery transport | UN38.3. | Battery core, battery module, battery pack, ESS rack | Test the battery module when the battery pack / ESS rack is 6,200 watts |
2 | CB certification | IEC 62619. | Battery core / battery pack | Safety |
IEC 62620. | Battery core / battery pack | Performance | ||
IEC 63056. | Power storage system | See the IEC 62619 for the battery unit | ||
3 | China | GB/T 36276. | Battery core, battery pack, battery system | CQC and CGC certification |
YD/T 2344.1. | Battery pack | Communication | ||
4 | The European Union | EN 62619. | Battery core, battery pack | |
VDE-AR-E 2510-50. | Battery pack, battery system | VDE certification | ||
EN 61000-6 Series specifications | Battery pack, battery system | CE certification | ||
5 | India | IS 16270. | PV battery | |
IS 16046-2. | ESS Battery (Lithium) | Only when the handling is less than 500 watts | ||
6 | North America | UL 1973. | Battery core, battery pack, battery system | |
UL 9540. | Battery pack, battery system | |||
UL 9540A. | Battery core, battery pack, battery system | |||
7 | Japan | JIS C8715-1. | Battery core, battery pack, battery system | |
JIS C8715-2. | Battery core, battery pack, battery system | S-Mark. | ||
8 | South Korea | KC 62619. | Battery core, battery pack, battery system | KC certification |
9 | Australia | Power storage equipmentElectrical safety requirements | Battery pack, battery system | CEC certification |
No number | Test terms | Number of certified tests | Test time | |
Battery unit | Battery pack | |||
1 | External short-circuit test | 3 | N/A. | Day 2 |
2 | Heavy impact | 3 | N/A. | Day 2 |
3 | Land test | 3 | 1 | Day 1 |
4 | Heat exposure test | 3 | N/A. | Day 2 |
5 | Excessive charging | 3 | N/A. | Day 2 |
6 | Forced discharge test | 3 | N/A. | Day 3 |
7 | Force the internal paragraph | 5 | N/A. | For 3-5 days |
8 | Hot burst test | N/A. | 1 | Day 3 |
9 | Voltage overcharge control | N/A. | 1 | Day 3 |
10 | Current overcharge control | N/A. | 1 | Day 3 |
11 | Overheating control | N/A. | 1 | Day 3 |
Total of the total | 21 | 5(2) | 21 days (3 weeks) | |
Note: “7″ and “8″ can be selected in either way, but “7″ is recommended. |
No number | Standard Number | Standard name | Note |
1 | UL 9540. | ESS and the facilities | |
2 | UL 9540A. | ESS evaluation method of hot storm fire | |
3 | UL 1973. | Batteries for stationary vehicle auxiliary power supplies and light electric rail (LER) purposes | |
4 | UL 1998. | Software for the programmable components | |
5 | UL 1741. | Small Converter safety standard | When being applied to the |
Test terms | Battery unit | The module | Battery pack | |
Electrical performance | Room temperature, high temperature, and low temperature capacitance | √ | √ | √ |
Room temperature, high temperature, low temperature cycle | √ | √ | √ | |
AC, DC internal resistance | √ | √ | √ | |
Storage at room temperature and high temperature | √ | √ | √ | |
Safety | Heat exposure | √ | √ | N/A. |
Overcharge (protection) | √ | √ | √ | |
Over-discharge (protection) | √ | √ | √ | |
Short-circuit (protection) | √ | √ | √ | |
Overtemperature protection | N/A. | N/A. | √ | |
Overload protection | N/A. | N/A. | √ | |
Wear the nail | √ | √ | N/A. | |
Press ressing | √ | √ | √ | |
Subtest test | √ | √ | √ | |
Salt ine test | √ | √ | √ | |
Force the internal paragraph | √ | √ | N/A. | |
Thermal diffusion | √ | √ | √ | |
Environment | Low air pressure | √ | √ | √ |
Temperature impact | √ | √ | √ | |
Temperature cycle | √ | √ | √ | |
Salt affairs | √ | √ | √ | |
Temperature and humidity cycle | √ | √ | √ | |
Note: The N/A. is not applicable② does not include all evaluation items, if the test is not included in the above scope. |
Post time: Jun-28-2021